Hirobo Bell 47G (GS)

 

 

Main rotor head assembly

 

 

 

 

The rotor head was largely preassembled in the factory.

 

 

 

Care is taken to make sure that the paddles and the flybar control arms are in the same plane

 

 

 

Control rods are added as per the instructions.

 

 

Previous Stage

Home

Next Stage

Back to Build Up

Webmaster: John Neasham